Skip to content

In practice

Any machine. Any production facility.

Motors and pumps, big process units, vehicles and fleets, tightly regulated lines. The rules change and the consequences change. The gap between what a site knows about its machines and what it needs to know does not.

Any sector · the same three steps

Rotating equipment

Motors, pumps, fans, compressors, gearboxes

The everyday workhorses. Never worth wiring up, now heard properly.

Heavy process units

Mills, crushers, kilns, columns, reactors

We hear what is happening inside through the wall of the machine, with no hole drilled in it.

Mobile fleets

Rolling stock, haul trucks, marine drivetrains

Fitted on board, or at the trackside with a location on every reading.

Regulated processes

Sterile vessels, hygienic lines, energy plant

Nothing touches the product, no new part to get approved, and a record that can only be added to, never edited.

Different sector, same three steps.

A process plant usually starts with documents, because the drawings stopped matching the plant decades ago. A materials handler starts with sensors, because there are too many machines to inspect one by one. A rail operator starts with safety. A regulated plant starts with whatever its auditor asked about. The order changes. The three steps do not.

Documents become one trusted equipment list, that list holds up a working model, and live readings keep the model up to date.

What stays the same

Three things come up every time. A handful of machines are watched and hundreds are not. Three systems disagree about the equipment list. And a model or a spreadsheet is still running on a number from four years ago.

What changes

  • How strict the rules are, from rail safety to pharmaceutical approval to environmental reporting
  • What counts as a win: output, uptime, yield, energy, a released batch, a delivered load
  • How harsh the surroundings are, from dust and mud to cleaning chemicals to standing water
  • Who signs it off. Plant manager, chief engineer, quality lead or regulator, and each wants a different first page

Entry points

Three ways a project usually starts.

Few sites buy all three divisions at once. The right first step is the one that answers the question on the table.

01 · Register first

When the equipment list is disputed

Common in older plants and after acquisitions. The cheapest place to begin, because we never need to visit the site.

02 · Model first

When the decision is a change

Common when a change to output, energy or layout is being argued about. The model turns the argument into a comparison.

03 · Measure first

When one group of machines hurts

Common wherever one group of machines causes the stoppages. Fit that group and report against a number the site already tracks.

Sectors

Sectors we already know well.

This is where we have worked so far. It is not a limit.

Where each sector usually starts.
SectorUsually starts withWhat counts as a win
Oil and gasDocuments first, then a model of a process that never stopsUptime and output
Mining and mineral processingSensors inside the crushing and screening lineMineral recovered, energy per tonne
ManufacturingOne equipment list that settles three conflicting onesOutput, scrap, cycle time
Rail and heavy transportWheel and track condition without closing the lineUptime, safety, ride comfort
Pharma, food and hygienic processProven cleanliness and an audited record of every changeBatches released without a problem
Energy, water, logistics, hospitalsWhatever the auditor or the plant manager points atUptime, cost per unit, compliance

A new industry does not need a new product. The three steps stay the same. Two things change: which faults we look for, and how the report is written. Why Unmined

Next step

Tell us the machine and the sore point.

Tell us which machines hurt and what they cost you. We will say which division answers it first, what we have already proved on that kind of machine, and which of the three we would rather you did not start with.