01 · Register first
When the equipment list is disputed
Common in older plants and after acquisitions. The cheapest place to begin, because we never need to visit the site.
In practice
Motors and pumps, big process units, vehicles and fleets, tightly regulated lines. The rules change and the consequences change. The gap between what a site knows about its machines and what it needs to know does not.
Rotating equipment
The everyday workhorses. Never worth wiring up, now heard properly.
Heavy process units
We hear what is happening inside through the wall of the machine, with no hole drilled in it.
Mobile fleets
Fitted on board, or at the trackside with a location on every reading.
Regulated processes
Nothing touches the product, no new part to get approved, and a record that can only be added to, never edited.
A process plant usually starts with documents, because the drawings stopped matching the plant decades ago. A materials handler starts with sensors, because there are too many machines to inspect one by one. A rail operator starts with safety. A regulated plant starts with whatever its auditor asked about. The order changes. The three steps do not.
Documents become one trusted equipment list, that list holds up a working model, and live readings keep the model up to date.
Three things come up every time. A handful of machines are watched and hundreds are not. Three systems disagree about the equipment list. And a model or a spreadsheet is still running on a number from four years ago.
Entry points
Few sites buy all three divisions at once. The right first step is the one that answers the question on the table.
01 · Register first
Common in older plants and after acquisitions. The cheapest place to begin, because we never need to visit the site.
02 · Model first
Common when a change to output, energy or layout is being argued about. The model turns the argument into a comparison.
03 · Measure first
Common wherever one group of machines causes the stoppages. Fit that group and report against a number the site already tracks.
Sectors
This is where we have worked so far. It is not a limit.
| Sector | Usually starts with | What counts as a win |
|---|---|---|
| Oil and gas | Documents first, then a model of a process that never stops | Uptime and output |
| Mining and mineral processing | Sensors inside the crushing and screening line | Mineral recovered, energy per tonne |
| Manufacturing | One equipment list that settles three conflicting ones | Output, scrap, cycle time |
| Rail and heavy transport | Wheel and track condition without closing the line | Uptime, safety, ride comfort |
| Pharma, food and hygienic process | Proven cleanliness and an audited record of every change | Batches released without a problem |
| Energy, water, logistics, hospitals | Whatever the auditor or the plant manager points at | Uptime, cost per unit, compliance |
A new industry does not need a new product. The three steps stay the same. Two things change: which faults we look for, and how the report is written. Why Unmined
Next step
Tell us which machines hurt and what they cost you. We will say which division answers it first, what we have already proved on that kind of machine, and which of the three we would rather you did not start with.